Draft Dee River Basin Management Plan 2027 to 2033
Simon Kitchen / LIFE Dee River
Dee draft River Basin Management Plan
This is the draft summary of the River Basin Management Plan (RBMP) for the Dee River Basin District (RBD) for 2027 to 2033. The purpose of this plan is to protect and improve the water environment for the wider benefits to people and wildlife. The first Dee RBMP was published in 2009 and updated in 2015 and 2021. This is a draft of the updated plan, which is being consulted on. The final updated RBMP will be published in December 2027.
This summary RBMP includes information on progress in the and details of proposed changes since 2021. It includes a summary of the current status of the water environment and the reasons for not achieving good and significant water management issues. The objectives for cycle 4 are summarised along with a summary of measures. Links to detailed information are provided throughout.
Natural Resources Wales (NRW) and the Environment Agency work jointly in the Dee RBD. Some waters in the RBD form the boundary between Wales and England, or cross between Wales and England. Collaborative working on the cross-border waters is essential to ensure the water environment is protected and improved in the RBD. Responsibility for coordinating the planning of the future of waters in Wales lies with NRW and in England lies with the Environment Agency.
1. Dee river basin district (RBD)
The Dee RBD is home to over 485,000 people and covers an area of 2,251 square kilometres across North Wales and England. The RBD consists of a single river basin; the River Dee, its tributaries and estuary and is characterised by a diverse physical and hydrological landscape.
It ranges from the mountains, uplands and lakes of Eryri National Park, including parts of the Migneint, Arenigs and Berwyns, through the middle reaches and the Clwydian Range and Dee Valley National Landscape to the open plains, meanders and meres of Cheshire and the mudflats of the Dee estuary in the lower basin with a very large tidal extent. There is an equally diverse geology, with the main river cutting through Silurian mudstone, Carboniferous limestone, coal and clay and finally the red sandstones of Permian and the Triassic as it reaches the Cheshire plains.
Figure 1 The Dee River Basin District
This diverse landscape supports a range of aquatic habitats and species along its length from source to sea, from floating water plantain, salmon, water crowfoots and associated assemblages, intertidal mudflats and sandflats, samphire and other salt marsh species and Atlantic salt meadows. Their presence has led to significant designations; River Dee and Bala Lake / Llyn Tegid are designated as a Special Area of Conservation (SAC), the Dee estuary / Aber Dyfrdwy is designated as a SAC, Site of Special Scientific Interest and a Special Protection Area. The Dee estuary and Llyn Tegid are also designated under the Ramsar Convention. There are rare aquatic species for which the Dee is the only known current location in the UK, the stonefly scarce yellow sally and the glutinous snail in Llyn Tegid, while the Gwyniad, a rare whitefish is only found in the Dee catchment in Wales.
The main river or tributaries often form the border between Wales and England and the catchment covers multiple administrative boundaries including 5 Welsh and 3 English unitary authorities. Two canals pass through the catchment; due to their relatively short sections in the Dee they are reported by the Environment Agency, with the Shropshire Union Canal in the North West RBD and the Llangollen canal in the Severn RBD.
Chester and Wrexham are the largest urban centres, while the dominant land uses are agriculture and forestry, particularly in the upper part of the basin. There are notable industrial hubs at Wrexham Industrial Estate and on the estuary at Deeside. There is a range of energy production including gas, hydropower and wind, and in the northeast cross border region of the catchment there is ongoing work around low carbon technologies. The catchment has legacies from both metal and coal mining.
The rivers, lakes and estuary of the Dee RBD are increasingly popular blue spaces where people enjoy connection with nature and gain significant benefits for physical and mental well-being.
The river Dee and its tributaries remain popular for fishing, particularly salmonids including grayling and the estuary for sea angling. A wide range of water sports are enjoyed, with sailing on lakes like Llyn Tegid and Llyn Brenig and at West Kirby, canoeing and whitewater rafting especially on the Tryweryn and Llangollen areas, river cruises and power boating downstream at Chester and on the estuary. Swimming is popular, with 2 designated bathing waters and takes place at a host of other locations not designated.
Water is also important part of the heritage of the catchment, which has a long history of physical modification for the movement of water. Canalisation of the Dee estuary was completed in the 1700s with the “New Cut” to aid navigation between Chester and Flint. And in the 19th century Thomas Telford built sluices at the outlet of Llyn Tegid at Bala and designed Horseshoe falls to regulate water flow and provide water for the canal at Ellesmere as well designing the Pontcysyllte aqueduct, the tallest navigable aqueduct in Britain. Some of these heritage water features that have shaped the Dee are now popular visitor attractions, with Horseshoe Falls, the aqueduct and canal part of a UNESCO world heritage site.
1.1 Strategic management
The River Dee is of strategic importance as a source of potable surface water for nearly three million people. As a result, the catchment has significant bespoke environmental management arrangements, underpinned by legislation and / or established governance.
The Dee Consultative Committee oversees the regulation of flows in the River Dee, where releases from storage reservoirs in the upper catchment enable abstractions for drinking water supply, modified flood response, fisheries, recreation and pollution benefits. NRW and the Environment Agency are jointly responsible for managing the Dee Regulation System under the Dee and Clwyd River Authority Act 1973.
The Dee Steering Committee was set up after a serious phenol pollution incident in the catchment in 1984. A partnership of environmental regulators and 4 water companies monitor water quality in the main river and major tributaries.
As additional protection for drinking water, the Dee catchment upstream of Chester weir is a Water Protection Zone, designated in 1999 and still the only one in the UK. Consent is required where certain substances are used or stored at specific sites. It helps prevent water pollution arising from activities that cannot be controlled using other legislation.
These multi-stakeholder approaches extend to the Dee estuary as well, although not for water quality purposes. NRW is the harbour and local lighthouse authority for a defined area of the estuary, in Wales and England, known as the Dee Conservancy from downstream of Chester Weir to the mouth of the estuary. The Dee Conservancy Consultative Committee consults on matters around the conservancy and navigation in the Dee Estuary, as required by Dee Estuary Conservancy Harbour Revision (No. 2) Order 2023.
In the Dee catchment there’s strong history of sustainable management of natural resources (SMNR). A cockle regulating order introduced in 2008 ensures sustainable management, balancing the livelihood of those working the wild fishery, local communities and the feeding requirement of the bird populations for which the estuary is also so important. The current order, regulated by NRW, expires in 2028. NRW and North Western Inshore Fisheries and Conservation Authority, as joint grantees of a new order are currently working together and with Defra and Welsh Government to develop a replacement order.
The net fishery for salmon and sea trout on the River Dee, has previously been controlled and managed by Net Limitation Orders (NLOs) under the Salmon and Freshwater Fisheries Act 1975. In 2009, Dee angling interests funded a full buy-out of the net fishery, and no net licences have been issued under the NLOs from 2009. Under new byelaws in 2025 NRW (working with Welsh Government the Environment Agency, Defra and Natural England) closed the draft and trammel net fisheries in the River Dee.
Internationally important “index” monitoring of the abundance and composition of salmon and sea trout populations, the Dee Stock Assessment Programme has taken place in the Dee for over 25 years by NRW and predecessors. Chester Weir fish trap is central to this programme.
Collaborative working in the Dee RBD
Collaborative working for the improvement and resilience of the water environment in the Dee continues to evolve and strengthen, whether for nature, water quality, well-being or for multiple benefits. There are increasing numbers of projects, programmes and partnerships between public bodies, water companies, environmental NGOs, and supportive landowners and communities, often working across administrative boundaries.
The catchment-based approach (CaBA), started in 2013, continues to work cross border to maintain, enhance and protect the Dee catchment and estuary through the Middle and Tidal Dee catchment partnerships. There are other activities including LIFE Dee River and Our Dee estuary.
Supporting information section 1.1
- Links to other parts of the plan and information for the Western Wales RBD and Dee RBD
- More detailed maps and information regarding the RBD is available on Water Watch Wales
- Further information on who manages and who is involved with the RBD can be found in the Technical Annex, section 3.3
- To respond to our consultation please see our Citizen Space page
- Environment Agency links will be added once published
1.2 Impact assessments
NRW has carried out the Strategic Environmental Assessment (SEA) of the Welsh Programme of Measures (national measures and water body measures) for the Welsh part of the Dee and the Environment Agency has carried out the assessment of English measures for the English part of the Dee. Each organisation has used their own SEA framework and methodology. NRW has brought both organisation’s assessments together into a single Environmental Report, considering cumulative effects across the RBD.
The Environmental Report has been undertaken at a strategic level and is used to identify likely significant effects, both positive and negative, as well as recommendations for mitigation of negative effects and opportunities to improve the plans through an iterative and interactive process. The RBMPs are fundamentally aimed at improving the water environment. The SEA must ensure that any negative effects are avoided, reduced or mitigated and seek to maximise positive effects.
A similar approach has been used to produce the draft Habitats Regulations Assessment of the draft Dee RBMP.
NRW has also completed a Health Impact Assessment for Wales which covers the Welsh part of the Dee RBMP in accordance with the requirements of the Health Impact Assessment (Wales) Regulations 2025. The findings have been used to inform the draft RBMP, Environmental Report and Equalities Impacts Assessment.
Supporting information section 1.2
- Read more about the Interim Programme of Measures Progress Review, and the equivalent Environment Agency report covering the English water bodies.
- Environmental Report
- Draft Habitats Regulations Assessment of the draft Dee RBMP
- Health Impact Assessment
- Environment Agency links will be added once published
1.3 Progress review 2021-2025
The River Basin Management Plans 2021-2027: Interim Programme of Measures Progress Review was published in October 2025. A review of progress throughout the 6 years of cycle 3 will be included in the final RBMP.
This incorporates the national measures of both NRW and the Environment Agency, the Dee Opportunity Catchment and the work of the 2 cross border CaBA partnerships in the Middle Dee and Tidal Dee. The LIFE Dee River is a key project delivering within this RBD.
- Securing improvements to water quality throughout the catchment including a review of wastewater permits to reduce phosphorus. Feasibility studies to reduce metal loading from abandoned metal mines in the Clywedog.
- Regulatory and advisory work with agricultural landowners and farm interventions to reduce nutrient inputs and to protect soil.
- Improvements for fish migration for salmon, sea trout, lamprey species, bullhead and eels in the main Dee and tributaries through a combination of weir removal, easements, fish passes and adaptive management of other assets.
- Building future resilience for rare species including freshwater pearl mussel and the scarce yellow sally stonefly, as well as riverine habitat restoration.
- Strengthening existing collaborations and building new ones. Examples include new ways of working to join up across north west and north east Wales, 4 water companies working together to plan drinking water catchment Asset Management Plan (AMP) delivery, Dee Nutrient Management Board, integrated approach to flood risk management, nature recovery opportunities with local nature partnerships on both sides of the border, inspiring and involving local communities around the species, habitats and quality of the river through to the coastal habitats in the estuary.
- Through CaBA actions across 18 measures, a summary is available at Middle Dee and Tidal Dee.
Supporting information section 1.3
1.4 Changes for cycle 4
Each cycle of updating the RBMP considers any changes, these are set out in the draft RBMPs and are primarily associated with technical aspects of the plan such as how we determine the classification status of the RBD.
Proposed water body changes
For cycle 4 some water bodies will be amended, a summary is below:
- Splitting the large Dee – Chester Weir to Ceiriog (GB111067057080) river water body into 2 smaller water bodies. Further details can be found in Section 4.3 of the Technical Annex.
- Changes to water body names
- Water body boundary changes
- The designations of several heavily modified water bodies will be amended
Full details are in the Technical Annex, Appendix A.
Changes to protected areas
For cycle 4 some of the protected areas have been amended, a summary is below:
- One new inland bathing water has been designated in England in May 2026 on the River Dee, Sandy Lane, Chester.
- Splitting the large Dee – Chester Weir to Ceiriog (GB111067057080) Drinking Water Protected Area into 2 smaller water bodies. Further details can be found in Section 4.3 of the Technical Annex.
- In Wales, Welsh Government are reviewing the Shellfish Water Protected Areas (SWPA). Any changes will be consulted on separately by Welsh Government and included in the final RBMP.
- In England, the Environment Agency are consulting on proposed changes to designated boundaries on behalf of Defra. There is a proposed (minor) extension at the mouth of the Dee (East) SWPA which will be consulted on by the Environment Agency/Defra in January 2027.
The Protected Areas Register for Wales will be updated and published as part of the final RBMP and maps updated on Water Watch Wales. The Environment Agency publish information on Protected Areas including Nitrate Vulnerable Zones and Safeguard zones.
Changes to the SAC lake water quality targets in Wales are included as part of this consultation, for details refer to the Technical Annex, section 4.3 and Water Watch Wales.
Changes to the Programme of Measures
The most significant change to the Programme of Measures is the requirement to include measures at the water body scale as clarified by the Court of Appeal judgement (Costa Beck judicial review). The approach for this work has been set out for Wales in the Technical Annex and a summary for England and Wales is included in Section 3 below.
Supporting information section 1.4
- Changes to water bodies and designation of artificial or heavily modified water bodies Technical Annex Appendix A
- Changes to protected areas, Technical Annex section 4.3
- Approach taken for the cycle 4 Programme of Measures, Technical Annex section 6
- Protected Area Register
1.5 Why this plan matters and what it will aim to achieve
The updated Dee RBMP provides an opportunity to assess and review the status of the RBD alongside setting out the measures that are needed for the next 6 years. It aims to progressively reduce the number of elements failing in water bodies and improve the overall condition of water bodies, by addressing the multiple pressures across our failing water bodies.
The impacts of climate change on our landscape and seascape are already evident, with storms, drought, record-breaking temperatures and wildfires. These can make the pressures of pollution from our everyday activities, land management and past more pronounced. Biodiversity is under pressure, salmon is predicted to be locally extinct in some Welsh rivers by 2030.
Managing natural resources across landscapes, in an integrated way will provide opportunities to deliver multiple benefits. There are already many good examples of partnership working and which need to be built on. NRW need to ensure that the objectives for RBMPs are integrated in other plans and policies. This must involve Flood Risk Management Plans, Water Company Business Plans, Shoreline Management Plans and the sustainable farming scheme, this plan forms part of the Area Statements.
Over the next 6 years this plan will:
- Seek to work collaboratively across the Dee RBD from source to estuary to maximise opportunities and outcomes through the work NRW and partners do, including an option for a future Dee Liaison Panel or equivalent
- Use the water body measures work to better address the causes of failures in our waters
- Support the delivery of measures by using innovation and tools such as Programme of Measures Power BI and heat maps to help us prioritise and act
- Continue using data and evidence to inform the understanding of the problem so that the appropriate measures can be applied, maximising on opportunities that arise
- Act to address continued challenges from a broad range of pressures including excess nutrients in the River Dee SAC and Dee Estuary SAC catchments, spills from storm overflows, chemicals and the challenges resulting from climate change
- Use this RBMP to influence and inform future Water Reform ‘A new vision for water’ in England and ‘Shaping the Future of Water Governance in Wales’ ensuring lessons can be learnt from the work that has been undertaken in the Dee RBD since the first plan in 2009 and ensuring the longevity of the aspirations within this plan.
- Bring a focus on the everyday actions everyone can take so the plan includes useful tools to support wider community involvement
Supporting information section 1.5
- Approach taken for the Programme of Measures Technical Annex section 6
- Programme of measures and protected areas – Water Watch Wales
- Programme of Measures Power BI
- Environment Agency links will be added once published
2. State of the water environment
This section looks at the current state of the water environment and provides a summary of the status of the waters in the Dee RBD based on the current classifications. As a cross border RBMP the RBD includes 83 water bodies in Wales and 11 water bodies in England. Unless otherwise stated within this section all figures are for the whole RBD. Reasons for not achieving good status or potential (the minimum objective for water bodies) are also summarised, these help inform measures which are required during the timeframe of this plan to achieve the objectives.
2.1 Status of water bodies
Water body status is determined through classification, in this draft RBMP different classifications are used:
- Cycle 3 Interim Classification (2024) for surface waters in Wales
- Cycle 3 Classification (2021) for groundwaters in Wales
- Cycle 4 Classification (2025) for all water bodies in England
The classification will be updated for Welsh water bodies in the final RBMPs which will be published in December 2027.
Overall status
In the Dee RBD 39% of water bodies achieve good or better overall status.
Table 1 Overall status for water bodies
|
Water body type |
No. of water bodies |
High |
Good |
Moderate |
Poor |
Bad |
|---|---|---|---|---|---|---|
|
River |
71 |
0 |
28 |
33 |
7 |
3 |
|
Lake |
17 |
0 |
7 |
8 |
1 |
1 |
|
Groundwater |
5 |
0 |
2 |
0 |
3 |
0 |
|
Estuary |
1 |
0 |
0 |
1 |
0 |
0 |
|
Total |
94 |
0 |
37 |
42 |
11 |
4 |
Figure 2 Overall water body status in the Dee RBD
Element level status
For each water body the overall water body classification is made up from individual chemical, biological and physical elements. The one out, all out approach is used to classify water bodies so the lowest element classification drives the overall classification. This ensures that overall ecological status is the driver for improvement rather than prioritising individual elements. Morphology and hydrological regime are supporting elements. They classify as either "high" or "not high".
The 2024 data for all water body types in the Dee RBD shows that 84% of elements are at good or better status. This can be split into the different water body types: 85% for rivers, 70% for lakes, 87% for estuaries and 92% for groundwater bodies.
Figure 3 Dee RBD element level status
Ecological status
There are 89 surface water bodies in the Dee RBD. Table 2 and Table 3 below shows the number of water bodies in each status class.
Table 2 Ecological status for surface waters (assessed water bodies)
|
Water body type |
No. of water bodies |
High |
Good |
Moderate |
Poor |
Bad |
|---|---|---|---|---|---|---|
|
River |
71 |
0 |
30 |
31 |
7 |
3 |
|
Lake |
17 |
0 |
7 |
8 |
1 |
1 |
|
Estuary |
1 |
0 |
0 |
1 |
0 |
0 |
|
Total |
89 |
0 |
37 |
40 |
8 |
4 |
Table 3 Chemical status for surface waters
|
Water body type |
No. of assessed water bodies |
Pass |
Fail |
|---|---|---|---|
|
River |
61 |
54 |
17 |
|
Lake |
17 |
17 |
0 |
|
Estuarine |
1 |
0 |
1 |
|
Total |
79 |
71 |
18 |
Groundwaters – status
Of the 5 groundwater bodies in the Dee RBD all achieve good quantitative status and 2 achieve good chemical status.
Supporting information section 2.1
- Assessment of water body status, Technical Annex section 4.2.3
- Maps on status and classification data Water Watch Wales
- Environment Agency links will be added once published
2.2 Significant water management issues in the Dee River Basin District
Reasons for not achieving good and reasons for deterioration
Where an element is classified at less than good status or potential, or has deteriorated, an investigation is carried out to identify the cause of the failure or deterioration. These are recorded using a defined set of reasons which are used to identify appropriate measures. NRW carries out this process in Wales, the Environment Agency carries it out in England.
Significant water management issues
NRW have used the reasons for not achieving good data to identify the most important issues that threaten the current and potential future uses of the water environment. These are known as the Significant Water Management Issues (SWMIs), these were consulted on in NRW’s 2026 Challenges and Choices Consultation, and the Environment Agency’s equivalent Significant Water Management Issues consultation. The breakdown in the Dee is as follows:
- Physical modifications (21 water bodies)
- Pollution from rural areas (29 water bodies)
- Pollution from wastewater (19 water bodies)
- Pollution from towns, cities and transport (11 water bodies)
- Pollution from abandoned mines (6 water bodies)
- Changes to the natural flow and level of water (5 water body)
- Natural (5 water bodies)
These figures represent a snapshot in time (Wales - April 2026, England - March 2026). As further investigations are undertaken and measures completed on the ground the dataset is updated. There are failures due to suspect data which are being investigated. Other failures can include the time needed for the ecology to recover after intervention and where natural barriers such as waterfalls limit fish movement.
Supporting information section 2.2
- Reasons for not achieving good, Technical Annex section 4.4.1, dataset Water Watch Wales
- More detail on Significant Water Management Issues, Technical Annex section 4.4.2
- More detail Pressures, Technical Annex section 4.4.3
- More detail on Our consultation process, Technical Annex section 7
- Water Watch Wales
- Environment Agency links will be added once published
3. Objectives and measures
This section summarises the objectives and Programme of Measures and draws out how these, alongside our understanding of the challenges and cost could be implemented during 2027 to 2033. These will be updated for the final RBMPs.
3.1 Setting objectives
This plan sets out what NRW and the Environment Agency intend to achieve by 2033. In England this is in the Dee River Basin Management Plan: Environmental Objectives in England document which will be available in December 2026. In Wales, this plan sets out what NRW intends to achieve to meet the statutory objectives:
- Prevent deterioration in status - Water body status will not be allowed to deteriorate
- Achieve the objectives for protected areas - Achieve the standards set by the relevant legislation under which they were designated. For water dependent European sites, work will continue towards achieving conservation objectives.
- Aim to achieve good overall status/potential for surface waters and ground waters - Implement measures to achieve good overall status where they are technically feasible and not disproportionately costly
This is identified by setting an objective for each water body and quality element. In Wales, the detailed outcomes of this information can be accessed at Water Watch Wales and a more detailed description of NRW’s approach is provided in the Technical Annex.
As required under Water Framework Directive Regulations 2017 (WFDR) NRW aims to implement measures to achieve good overall status/potential for surface and groundwaters by 2027. Alternatives to that objective are allowable which may result in 2 additional options:
- an objective of less than good by 2033 (less stringent objective) due to technical infeasibility (no known technical solution is available) or disproportionate cost (unfavourable balance of costs and benefits)
- or an extended deadline of good status/potential to, or beyond 2033 for reasons of natural conditions (ecological recovery) or technical infeasibility for a small number of chemicals
For each protected area, other than shellfish water protected areas, the objective is to achieve compliance with any standards/targets and objectives required by the relevant Regulations for which the area or body of water is designated. For European sites the objective is to achieve favourable condition. Where 2 or more objectives apply to the same body of water, or the same part of a body of water, the most stringent objective applies. When setting a WFDR objective for a water body that is at less that good status, it is not acceptable for the WFDR objective to undermine those of other protected areas such as European sites.
All objectives must be reviewed for every planning cycle as new evidence and measures to resolve environmental pressures become available. A small number of water bodies have an objective of less than good status or potential on the basis of them being disproportionately costly, or technically infeasible to improve to good status over the cycle 4. In these water bodies some national and water body measures will be taken to improve the water quality and contribute towards SMNR values in Wales. In Wales, if significant SMNR values would be accrued, or downstream catchment benefits gained as a result of further intervention, then they will be encouraged. However, it is unlikely that measures over one cycle will be sufficient to result in a classification status change. No deterioration remains an objective for these water bodies.
The disproportionate cost assessment has been made on 225 water bodies across Wales, this includes 19 for the Dee RBD which it has been possible to collate costs for. Since publication of the second RBMP, in Wales, the Environment (Wales) Act 2016 and Well-being of Future Generations (Wales) Act 2015 allows us to consider benefits of improvement in water quality that the benefits valuation for the WFDR may not include, such as using mine water remediation to heat local homes. For this reason, in Wales measures in water bodies that are calculated to be disproportionately costly for the WFDR requirement may still be progressed if it is demonstrated that there are wider and significant SMNR values that would be accrued.
Figure 4 shows the 19 water bodies in Wales considered for economic assessment for the Dee RBD, ranked on the x-axis from the most cost-beneficial to improve to the least cost-beneficial. The blue bars represent the cost-benefit ratio for each water body, while the orange line shows the cumulative cost of achieving good status or good ecological potential. The cumulative cost rises gradually for the most cost-beneficial water bodies before increasing more sharply for a relatively small number of higher-cost interventions, demonstrating the influence of a limited number of expensive improvement schemes on overall programme costs.
The total estimated cost of improving the 225 assessed water bodies across Wales is approximately £590 million. Of this, the Dee RBD accounts for 19 costed water bodies in Wales with an estimated cost of £85 million. As with previous assessments, these figures represent only those water bodies for which costs have been quantified, and the overall cost of achieving objectives across all water bodies is likely to be higher. Delivery of improvements will also depend on the availability of appropriate regulatory mechanisms, land access, partnership opportunities and the technical feasibility of addressing the identified pressures.
Figure 4 shows the 19 water bodies in Wales considered for economic assessment in the Dee RBD, ranked from the most cost-beneficial to improve to the least cost-beneficial. The blue bars show the cost-benefit ratio and the orange line shows cumulative improvement costs.
Supporting information section 3.1
- In Wales, additional detail on objectives, Technical Annex, section 5
- In Wales, additional data on objectives and cost on Water Watch Wales
- In England, Environment Agency additional detail on objectives
3.2 Summary of the draft programme of measures
This section sets out a summary of the cycle 4 draft programme of measures. These are informed by new evidence and information from current and previous cycles. These will be updated, as required, following the outcome of this consultation and in Wales these will also be updated following the release of final classification which will be in 2027. For cycle 4, in England and Wales, the Dee RBMP includes water body measures for individual water bodies which is a requirement clarified by the Court of Appeal judgement (Costa Beck judicial review). The approach for the programme of measures is set out in the Technical Annex in Wales and a summary of the approach in England is provided below.
Across the RBD a source to sea approach should be taken is taken to aim to integrate these programmes to maximise the opportunities and benefits. Many of the measures have multiple benefits. For example, sustainable drainage systems can help to reduce diffuse pollution, reduce surface run-off and flood risk, and deliver biodiversity through green infrastructure rather than hard engineering.
In Wales, the draft programme of measures includes:
National measures - These usually apply to the whole of Wales, England and Wales, or the United Kingdom. In general, these set the legislative, policy or strategic approach and support, or are critical to, local delivery and environmental outcomes. They also include some of the main delivery programmes. For example, a national ban on using a particular chemical or a national strategy for prioritising and funding the remediation of abandoned mines. There are 54 national measures in Wales, this includes 6 new measures for cycle 4, they are on the programme of measures power BI.
Water body measures – These measures apply to a specific water body and directly address a reason for not achieving good status/potential (RNAGs) or reason for deterioration (RfDs). Water body measures also include investigations where a failure and RNAG / RfD is yet to be confirmed. In Wales, these are on the programme of measures power BI.
For cycle 4 the programme of measures has been grouped under delivery mechanisms:
- Regulation (legislative mechanisms)
- Strategic plans
- Financial incentives
- Partnerships
- Investigations
- Water company investment (National Environment Programme - NEP)
- Research, demonstration projects or pilots
- General education, advice campaign or scheme
More information to the legislative means to implement measures is available.
The programme of measures can be delivered via several key national programmes of work:
- NRW’s WFDR driven programmes
- Catchment scale approaches from source to sea including work through river restoration, sustainable fisheries opportunities and the LIFE Dee River project
- Dee Nutrient Management Board
- Flood and coastal risk management
- The NEP which includes delivery of the storm overflow and the water resources restoring sustainable abstraction programme
- Sustainable Farming Scheme and National Forest for Wales
- Welsh Government Nature and Climate Emergency Capital Fund and the National Peatland Action Programme in Wales
Within the RBMP these are organised under the Significant Water Management Issues and a summary is included below.
Achievement of WFDR objectives requires combinations of measures to be delivered across many sectors and organisations, as partnership projects as well as by the public – everyone has a role to play.
In England, the Environment Agency developed the programme of measures through a staged process. Area teams reviewed the reasons why individual water bodies are not achieving good status or potential and identified measures to address them. These measures were recorded at water body level and linked to the relevant pressure, sector and delivery mechanism, providing a clearer line of sight between the evidence, the action required and how it could be delivered. National and strategic measures continue to provide the policy, regulatory and investment framework within which local action takes place.
The measures in English were then refined with delivery teams, partners and stakeholders so that they were specific enough to show what action is needed without implying that every measure is already funded or committed. Investigations are listed as measures where the cause, scale or most effective solution is not yet sufficiently certain. The draft measures will be consulted on and updated for the 2027 RBMPs, with implementation drawing on regulation, Environment Agency and partner programmes, water company investment, land-management incentives and catchment partnerships.
The Environment Agency is running a consultation on programmes of measures for water bodies from 21 December 2026 to 21 March 2027. This consultation includes measures for the 11 water bodies in the Dee RBD that are in England, it is running in parallel to the consultation on the draft updates to RBMPs.
Summary programme of measures by significant water management issue for the Dee RBD
Physical modifications
Summary of national measures:
- Flood Risk Management activities
- Shoreline Management Plan policy for coastal defence management
- Sustainable Fisheries Programme
- The Climate Resilient Fisheries Strategy
- Water Company AMP including NEP commitments
- River Restoration Programme
Summary of water body measures:
- Resolve impacts caused by barriers to fish migration and natural continuity in river and tidal channels (e.g., dams, weirs, culverts, sluices, tidal gates)
- Improve insufficient flow regime (baseline flow quantity or flow variability) downstream of water storage impoundments
- Resolve impacts caused by operational water level management for land drainage or flood protection
What these measures will aim to achieve:
- Where modifications to the water environment are essential to society, for example navigation, public water supply, coastal defence or flood management, we want to mitigate harmful impacts as far as possible while protecting those uses
- LIFE Dee River Project delivered and after LIFE Plan in place
- Deliver the NRW river restoration programme
- Continue to address barriers to fish migration in the catchment
- In England we will have completed investigations and developed a pipeline of restoration and mitigation projects that work with natural processes from source to sea, prioritising nature-based solutions to restore river and coastal function, reconnect habitats, remove barriers where appropriate and improve resilience to climate change, supported by the delivery mechanisms, partnerships and investment needed for implementation.
- We want to increase the resilience of our catchments to make fish populations more resilient to other pressures, including climate change
- Target nature-based solutions for physical modifications on the coast
- Deliver the Water Company NEP / AMP commitments (AMP8 and AMP9)
Managing pollution from wastewater
Summary of national measures:
- Water Company AMP including NEP commitments
- Drainage and Wastewater Management Plans
- Nutrient Management Plan for the River Dee SAC Catchment
- Sustainable drainage systems
Summary of water body measures:
- Deliver action(s) identified in the NEP / AMP to restore SAC towards favourable condition
- Ensure septic tanks are compliant with regulatory requirements, follow advice and guidance on maintenance
- Deliver improved discharge quality/reduce spills from all intermittent point source discharges e.g. storm overflows
- Where required review/amend permits to reduce impact of discharges
What these measures will aim to achieve:
- Deliver the Water Company NEP / AMP commitments (AMP8 and AMP9)
- Reduce pollution risks and the negative impact of pollution from sewage and waste water on biodiversity by 2030 (Welsh Government Environment (Principles, Governance and Targets) Act 2027)
- Sewerage systems including storm overflows, are maintained or improved so they operate effectively and their impacts on the water environment, from source to sea are minimised
- Water company sewage discharges to the River Dee and Dee Estuary SAC catchment meet their nutrient standards
- Deliver an integrated approach to excess nutrients within the River Dee SAC catchment
- Solutions to storm overflow problems that deliver multiple benefits are embedded in planning and development across the RBD (e.g. water sensitive urban design, sustainable drainage schemes) and central to the DWMP
- Increased public awareness of the impacts of misconnections and disposal of harmful substances into sewerage systems (e.g. paint, oil, fats and garden chemicals)
- Maintain and improve bathing and shellfish waters to promote a thriving tourism and shellfish aquaculture industry
Manage pollution from rural areas
Summary of national measures:
- Sustainable Farming Scheme delivering a programme of incentives, advice and guidance, innovation and improvements to rural diffuse pollution
- Agricultural Regulatory Inspections Programme (Environment Agency, commenced 2021 and ongoing)[SR30.1]
- Ensure compliance with the Water Resources (Control of Agricultural Pollution) (Wales) Regulations 2021 in Wales
- Nutrient Management Plan for the River Dee SAC Catchment
- Water Company AMP including NEP commitments
- Welsh Government target Woodland Management incentives to deliver improvements to the water environment
- The UK Forestry Standard Guidelines (including “Forests and Water” Guidelines), and Practice Guides (including “Managing forests in acid sensitive water catchments”)
Summary of water body measures:
- Reduce nutrient and/or organic loading within the water body to restore SAC towards favourable condition
- Improve land management to ensure that all nutrient and fertiliser applications match soil and crop requirements and reduce soil erosion to minimise nutrient and sediment losses from land
- Ensure chemical products are applied according to manufacturer’s instructions and any waste generated is disposed of appropriately
- Ensure that soil is managed appropriately preventing and reducing compaction and subsequent erosion caused by vehicle movements and/or livestock poaching/overgrazing
- Ensure that management complies with the UK Forestry Standard and improve awareness and implementation of UK Forestry Standard and associated practice guides across the forestry sector to reduce pollution
What these measures will aim to achieve:
- The Welsh Governments Sustainable Farming Scheme addresses rural diffuse pollution
- The Environment Agency continues to make progress with their agricultural inspections including investigations, monitoring, walkovers and compliance assurance
- Reduce pollution risks and the negative impact of pollution from excess nutrients on biodiversity by 2030 (Welsh Government Environment (Principles, Governance and Targets) Act 2027)
- Deliver an integrated approach to excess nutrients within the River Dee SAC catchment including a holistic approach to nitrogen deposition integrating both air and water quality impacts
- Deliver the Water Company NEP / AMP commitments (AMP8 and AMP9) including Drinking Water Protected Areas catchment solutions
- Understand, characterise and evaluate the impact of septic tank abundance and/or proliferation within the Dee RBD.[SR31.1]
- Appropriate new woodland creation and forestry management that benefits the water environment and people through outdoor recreation and delivers ecosystem services such as reduced diffuse pollution, reduced flood flows, clean drinking water, habitat for fish and wildlife, and shade in river margins to mitigate the impacts of climate change
- We will manage our Welsh Government Woodland Estate to meet the UK Forest Standard Forest & Water Guidelines as a minimum and tackle metal mine pollution with innovative approaches to remediate the toxic discharges associated with these sites that are on the estate
- Rural land management contributes to sustainable, long-term recovery to natural pH conditions in areas where water bodies are compromised by acidification
Managing pollution from abandoned mines
Summary of national measures:
- Metal Mine Strategy for Wales
- Mining Remediation Authority programme of work
Summary of water body measures:
- Control and remediate point and/or diffuse discharges from abandoned metal mines
- Control and remediate point and/or diffuse discharges from abandoned coal mines
What these measures will aim to achieve:
- We want to mitigate the impacts of abandoned mines on the water environment through a strategic work programme across Wales. It will take decades to address all the issues and we will prioritise actions that deliver the best ecological, social and economic outcomes for society’s investment
- Investigation work at Minera in the Clywedog catchment, including working with the Dee Trust and Wrexham Rivers project. Also work at Trelogan mine in the Y Garth tributary[HM32.1]
- Deliver the mine water preventative and remediation programme in relation to coal mines
Manage pollution from towns, cities and transport
Summary of national measures:
- Drainage and Wastewater Management Plans
- Contamination from historic industrial and waste sites
- Control the release of chemicals at source
- Awareness and benefits of managing surface water run-off
- UK Forestry Standard Guidelines (including “Forests and Water” Guidelines), and Practice Guides
Summary of water body measures:
- Maintain and improve sewerage drainage system to rectify misconnections and leaks
- Secure compliance through regulatory controls on emissions with Environmental Permitting (England and Wales) Regulations 2016, Environment (Air Quality and Soundscapes) (Wales) Act 2024 and Environment Act 1995
- Review and where appropriate vary and/or enforce existing Discharge Permits
What these measures will aim to achieve:
- Delivery of the Drainage and Wastewater Management Plans
- We want to minimise the negative impact of historic and future development on the water environment via our role as a land quality consultee in the planning process or, where the planning process is not applicable, by providing advice and assistance to local authorities with their contaminated land inspection strategy
- Implementation of legislation to control the release of chemicals at source
- We want to put SMNR at the centre of urban design and planning. By using sustainable drainage systems, restoring the areas around rivers and coasts including the riverbanks, floodplain and the intertidal area, providing public green spaces, raising awareness and changing behaviour to improve the quality of life in the urban areas of Wales
- We will continue to regulate emissions of acidifying pollutants to allow the water environment to recover
- Continue to work in partnership within the urban environment on community awareness of the impacts of misconnections
Changes to the natural flow and levels of water
Summary of national measures:
- Water Company AMP including NEP commitments
- Welsh Government National Peatland Restoration Programme
- Flood Risk Management activities
- Heavily Modified Water body mitigation measure review
- Water efficiency including multi-sector demands work
Summary of water body measures:
For the draft RBMP programme of measures the only water body measures that are included are water resources investigations.
What these measures will aim to achieve:
- Deliver the Water Company NEP / AMP commitments (AMP8 and AMP9) including restoring long-term sustainable abstraction and use of nature-based solutions
- Continue to deliver the Welsh Government National Peatland Restoration Programme
- We want to encourage sustainable land use patterns in urban and rural environments that reduce runoff from rainfall including nature-based solutions
- We want to deliver interventions such as in-channel habitat improvement that mitigate the impacts of abstraction on the water environment
- We want to better understand the water demands across sectors
- Through Waterwise continue to improve water use efficiency to reduce the need for additional abstraction in the future
Managing invasive non-native species
Summary of national measures:
- Implementing the updated GB strategy on invasive non- native species (INNS)
- Water Company AMP including NEP commitments
No water body measures:
INNS are a pressure across the Dee RBD but they are not the reason any water body is not achieving good status or potential so there are not specific water body measures.
What these measures will aim to achieve:
- For existing INNS we want to prioritise actions to slow down or prevent their spread
- We also want to minimise the risk posed by INNS generally through improved biosecurity and improved local information on INNS distribution and impact
- Deliver the Water Company NEP / AMP commitments (AMP8 and AMP9)
Supporting information section 3.2
- Technical Annex section 6
- National measures, Water Watch Wales and Power BI
- Environment Agency links will be added once published